"March 2010.", Report "submitted pursuant to: 42 U.S.C. 4332(2)(c), 49 U.S.C. 303, and U.S.C. 138.", Online resource; title from PDF cover (viewed August 2016), "CDOT Project No. STU 0062-019 (15215)."
submitted to Colorado Department of Transportation Region 1 & Region 4 ; submitted by Felsburg Holt & Ullevig [and] Atkins ; in association with Pinyon Environmental, Inc., "April 2018.", Online resource; title from PDF cover (viewed January 2019), FHU Reference no. 112196-04.
submitted to Colorado Department of Transportation Region 1 & Region 4 ; submitted by Felsburg Holt & Ullevig [and] Atkins ; in association with Pinyon Environmental, Inc., "April 2018.", Online resource; title from PDF cover (viewed January 2019), FHU Reference no. 112196-04.
The Colorado Department of Transportation (CDOT) initiated this US 24 PEL Study to examine existing transportation conditions and anticipated problem areas along the US 24 corridor in El Paso County between Powers Boulevard and the Town of Ramah. The study identified and screened a reasonable range of potential transportation improvements to develop an implementation plan for projects to meet the operational, safety, and capacity needs along the corridor. The study was conducted following Federal Highway Administration (FHWA) PEL guidance regarding the integration of transportation planning and the National Environmental Policy Act (NEPA) process, which encourages the use of planning studies to provide information for incorporation into future NEPA documents., Final corridor conditions report (December 2016) -- Final corridor conditions report appendix (December 2016) -- Final alternatives report (October 2017) -- Final planning & environmental linkages (PEL) report., Submitted from Region 2 of the Colorado Department of Transportation.
submitted pursuant to: 42 U.S.C. 4332(2)(c), 49 U.S.C. 303, and 23 U.S.C. 138 by the U.S. Department of Transportation, Federal Highway Administration, the Colorado Department of Transportation., Submitted from Region 2 of the Colorado Department of Transportation., Description based on print version record.
The recommendations contained in this Corridor Management Plan (CMP) are intended to help the Byway move into the next phase of its existence. Changes in travel patterns and behaviors, the increasing use of the internet in travel planning, population growth on Colorado's Western Slope, and increasing demands on Byway resources necessitate updating the CMP to position the UTB for success in its next 25 years., Advanced Resource Management, Inc., the National Trust for Historic Preservation, Whiteman Consulting., "September 12, 2013.", Online resource; title from PDF cover (viewed May 2022)
Ahmad Ardani., Prepared in cooperation with the Federal Highway Administration., "January, 1993.", Includes bibliographical references (page 25)., Final report., Print version record.
Access control plan -- Appendix A: US 6 existing access locations -- Appendix B: US 6 access control plan map -- Appendix C: Access control plan table -- Appendix D: Draft inter-governmental agreement -- Appendix E: Mailing list -- Appendix F: Average daily traffic counts -- Appendix G: Peak hour turning movement counts -- Appendix H: Existing conditions level of service -- Appendix I: Safety study -- Appendix J: 2035 no-action level of service -- Appendix K: First open house summary report -- Appendix L: Second open house summary report -- Appendix M: Final Public Open House summary report -- Appendix N: 2035 Build Level of Service., Cover title., "November 2008."
Access control plan -- Appendix A: US 6 existing access locations -- Appendix B: US 6 access control plan map -- Appendix C: Access control plan table -- Appendix D: Draft inter-governmental agreement -- Appendix E: Mailing list -- Appendix F: Average daily traffic counts -- Appendix G: Peak hour turning movement counts -- Appendix H: Existing conditions level of service -- Appendix I: Safety study -- Appendix J: 2035 no-action level of service -- Appendix K: First open house summary report -- Appendix L: Second open house summary report -- Appendix M: Final Public Open House summary report -- Appendix N: 2035 Build Level of Service., Cover title., "November 2008."
Access control plan -- Appendix A: US 6 existing access locations -- Appendix B: US 6 access control plan map -- Appendix C: Access control plan table -- Appendix D: Draft inter-governmental agreement -- Appendix E: Mailing list -- Appendix F: Average daily traffic counts -- Appendix G: Peak hour turning movement counts -- Appendix H: Existing conditions level of service -- Appendix I: Safety study -- Appendix J: 2035 no-action level of service -- Appendix K: First open house summary report -- Appendix L: Second open house summary report -- Appendix M: Final Public Open House summary report -- Appendix N: 2035 Build Level of Service., Cover title., "November 2008."
Access control plan -- Appendix A: US 6 existing access locations -- Appendix B: US 6 access control plan map -- Appendix C: Access control plan table -- Appendix D: Draft inter-governmental agreement -- Appendix E: Mailing list -- Appendix F: Average daily traffic counts -- Appendix G: Peak hour turning movement counts -- Appendix H: Existing conditions level of service -- Appendix I: Safety study -- Appendix J: 2035 no-action level of service -- Appendix K: First open house summary report -- Appendix L: Second open house summary report -- Appendix M: Final Public Open House summary report -- Appendix N: 2035 Build Level of Service., Cover title., "November 2008."
Access control plan -- Appendix A: US 6 existing access locations -- Appendix B: US 6 access control plan map -- Appendix C: Access control plan table -- Appendix D: Draft inter-governmental agreement -- Appendix E: Mailing list -- Appendix F: Average daily traffic counts -- Appendix G: Peak hour turning movement counts -- Appendix H: Existing conditions level of service -- Appendix I: Safety study -- Appendix J: 2035 no-action level of service -- Appendix K: First open house summary report -- Appendix L: Second open house summary report -- Appendix M: Final Public Open House summary report -- Appendix N: 2035 Build Level of Service., Cover title., "November 2008."
Access control plan -- Appendix A: US 6 existing access locations -- Appendix B: US 6 access control plan map -- Appendix C: Access control plan table -- Appendix D: Draft inter-governmental agreement -- Appendix E: Mailing list -- Appendix F: Average daily traffic counts -- Appendix G: Peak hour turning movement counts -- Appendix H: Existing conditions level of service -- Appendix I: Safety study -- Appendix J: 2035 no-action level of service -- Appendix K: First open house summary report -- Appendix L: Second open house summary report -- Appendix M: Final Public Open House summary report -- Appendix N: 2035 Build Level of Service., Cover title., "November 2008."
Access control plan -- Appendix A: US 6 existing access locations -- Appendix B: US 6 access control plan map -- Appendix C: Access control plan table -- Appendix D: Draft inter-governmental agreement -- Appendix E: Mailing list -- Appendix F: Average daily traffic counts -- Appendix G: Peak hour turning movement counts -- Appendix H: Existing conditions level of service -- Appendix I: Safety study -- Appendix J: 2035 no-action level of service -- Appendix K: First open house summary report -- Appendix L: Second open house summary report -- Appendix M: Final Public Open House summary report -- Appendix N: 2035 Build Level of Service., Cover title., "November 2008."
Access control plan -- Appendix A: US 6 existing access locations -- Appendix B: US 6 access control plan map -- Appendix C: Access control plan table -- Appendix D: Draft inter-governmental agreement -- Appendix E: Mailing list -- Appendix F: Average daily traffic counts -- Appendix G: Peak hour turning movement counts -- Appendix H: Existing conditions level of service -- Appendix I: Safety study -- Appendix J: 2035 no-action level of service -- Appendix K: First open house summary report -- Appendix L: Second open house summary report -- Appendix M: Final Public Open House summary report -- Appendix N: 2035 Build Level of Service., Cover title., "November 2008."
Access control plan -- Appendix A: US 6 existing access locations -- Appendix B: US 6 access control plan map -- Appendix C: Access control plan table -- Appendix D: Draft inter-governmental agreement -- Appendix E: Mailing list -- Appendix F: Average daily traffic counts -- Appendix G: Peak hour turning movement counts -- Appendix H: Existing conditions level of service -- Appendix I: Safety study -- Appendix J: 2035 no-action level of service -- Appendix K: First open house summary report -- Appendix L: Second open house summary report -- Appendix M: Final Public Open House summary report -- Appendix N: 2035 Build Level of Service., Cover title., "November 2008."