The I-70 Mountain Corridor features mountainous terrain, increasing traffic congestion during peak travel times, and challenging weather conditions. This report summarizes results of a week-long workshop focused on improving traffic operations and mobility on the I-70 Mountain Corridor through potential low cost and no cost solutions.
The Water Quality Control Division (the Division) in the Colorado Department of Public Health and Environment is tasked with administering water quality control programs to protect waters of the state. The Division provides education, compliance assistance, permits, inspections and enforcement to promote prevention, control and abatement of water pollution. Per HB121119, the Division has been meeting since June (a total of 10 meetings) with stakeholders in the construction industry and other interested parties to develop a more responsive, streamlined process to improve compliance, reduce violations and provide timely enforcement. This report includes the results of this collaborative effort, including actions to develop more streamlined and responsive processes and recommendations for moving forward.
This guidance document is intended to provide direction to contractors, consultants and property owners and operators who are involved in soil disturbing activities in areas with known or suspected asbestos-contaminated soil, or where asbestos-contaminated soil is discovered. The guidance is meant to assist in compliance with the Solid Waste Regulations, and where applicable, Air Quality Control Commission Regulation No. 8, Part B (5 CCR 1001-10, Part B - Asbestos) referred to herein as Air Regulation No. 8, Part B. However, it is important that the reader be familiar with the regulations in order to understand the context of the information provided in this guidance.