The purpose of this report is to provide the reader with the ten-year analysis for the cost-benefit of hot mix asphalt projects constructed using the three and five-year warranty specifications developed by CDOT. There were eight projects evaluated using the three-year warranty specifications and two projects evaluated using the five-year warranty specifications. Each warranty project was evaluated with a comparable non-warranty (control) project. Overall, 214.6 lane-miles of warranty projects were constructed and compared to 276.6 lane-miles of control projects.