This report presents a case study on the evaluation of bridge decks using various non-destructive test methods. The primary interest lies in quantifying delaminated areas in deck concrete covered with asphalt overlays. Analytical and computational models are formulated to decompose the intensity of GPR scales into two categories: i) initiation and progression of corrosion and ii) delamination of deck concrete, which show good agreement with repaired areas. Parametric investigations emphasize the significance of rebar spacing and concrete cover in determining the extent of deck delamination.
CDOT has prioritized the research of select methods to evaluate the performance of the I-25 Gap work zone and future CDOT construction projects. Work zone performance measures provide comparative metrics that quantify the level of impact a work zone has on travelers, residents, businesses and workers. CDOT has identified the need to research and apply performance measures to the I-25 Gap construction project; establishing a foundation to improve the decisions that are made during planning, design and construction for the remainder of the I-25 Gap project and for future CDOT highway construction projects.