"September 1966."
This report was prepared with support from contract AT(11-1)-1349 with the U.S. Atomic Energy Commission, Principal Investigator, Elmar R. Reiter.
This material is based upon a doctoral dissertation submitted to Colorado State University.
Includes bibliographic references (p. 135-137).