Jump to navigation
Small hydropower case study. Town of Basalt small hydro project
Town of Basalt small hydro project Small hyrdopower case study
Colorado. Energy Office.
2013
Colorado Energy Office
Denver, Colo.
The Town of Basalt built a 40 kW hydro system utilizing water delivered to the Town's water treatment plant which will generate an estimated 300,000 kWh annually.
The misspelling Hyrdopower is in title. Online resource; title from PDF caption (viewed March 2017)
Small scale hydropower
Colorado
1 online resource (3 pages) : illustrations
eng
GOV11.2/B29/2013/INTERNET
http://hdl.handle.net/11629/co:25810
978274620
2017-03-31T14:56:11.659Z