Jump to navigation
Interregional connectivity study final report. Cover
ICS final report
CH2M HILL (Firm) Colorado. Division of Transit and Rail.
2014
CDOT Division of Transit and Rail
Denver, Colo.
This document presents the Alternatives Analysis of the Interregional Connectivity Study (ICS), which evaluated the engineering, environmental, and financial feasibility of implementing High-Speed Transit (HST) in Colorado.
prepared by CH2MHILL. "January 2014." Description based on online resource; title from PDF report title page; (viewed August 2015)
High speed trains--Planning Transportation
Colorado
1 online resource (4 files in 1 folder) : illustrations, maps.
eng
TRA2/7.2/C76/2014/INTERNET
http://hdl.handle.net/11629/co:23043
919007144
2019-09-13T21:05:42.146Z