The goal of this research project is to evaluate the performance of the crumb rubber test sections compared with the conventional control section and depending on performance, develop Colorado-specific materials and construction specifications for ground tire modified asphalt pavements. Also, the research project aims to develop guidelines and best management practices for the construction of ground tire modified asphalt pavements. Transverse cracking began in the rubber modified sections after 22 months of service and longitudinal cracking began after 29 months. The control sections have no transverse cracking to date with longitudinal cracking beginning to appear after 56 months.