This report describes the procedure and results of a regional search for sites that appear to be suitable for the relocation and/or reprocessing of the Grand Junction and Rifle uranium mill tailings piles. This search identified nine potential sites within the study area. A comprehensive site selection process was used to identify the recommended potential sites. Geotechnical characteristics were a primary element of this analysis.