TRA Colorado Department of Transportation

Pages

Field and analytical evaluation of the effects of tied PCC shoulders and widened slabs on performance of JPCP : final report
Field and analytical evaluation of the effects of tied PCC shoulders and widened slabs on performance of JPCP : final report
"October 1995.", Includes bibliographical references (p. 75-76)., Mode of access: World Wide Web.
Field log of structures
Field log of structures
Title from cover., "Date of data: May 16, 2005.", Chiefly tables., Mode of access: World Wide Web.
Field weathering test deck for reflective sheeting
Field weathering test deck for reflective sheeting
Historically the Colorado Department of Highways has approved roadside sign material based on data obtained using the weatherometer. While the weatherometer gives some comparative performance data related to UV stability and exposure to moisture, the true performance is best measured under actual field conditions. An outdoor exposure deck was constructed to test sign materials for their field performance and expected longevity. Sample materials were split into three pieces, one for the weatherometer testing, one for the outdoor exposure deck, and one to remain in original condition for later comparison. This report describes the construction of the deck, and the sheeting results after three years of exposure to Colorado weather., David A. Price., Introduction -- Test deck -- Weatherometer -- Materials -- Testing -- Test results -- Conclusions -- Implementation -- Appendices., In cooperation with the Federal Highway Administration., "July 1991.", Technical Report number: CDOH/DTD/R-91/5., Includes bibliographical references (page 13)., Final report., Print version record.
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater
Access control plan -- Appendix A: Existing roadway/access configuration -- Appendix B: Recommended roadway/access configuration -- Appendix C: Access control plan (ACP) -- Appendix D: Draft inter-governmental agreement -- Appendix E: Property information -- Appendix F: Average daily traffic (ADT) -- Appendix G: Turning movement counts (TMC) -- Appendix H: Existing level of service (LOS) -- Appendix I: Accident data -- Appendix J: 2035 no-action level of service (LOS) roadway laneage -- Appendix K: Initial public open house materials -- Appendix L: Second public open house materials -- Appendix M: Final Public Open House Materials -- Appendix N: Future level of service with recommended changes to access -- Appendix O: Conceptual design improvements at US 50/Unaweep Avenue and US 50/B 1/2 Road., Cover title., "November 2008."
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater. Appendix A: Existing Roadway/Access Configuration
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater. Appendix A: Existing Roadway/Access Configuration
Access control plan -- Appendix A: Existing roadway/access configuration -- Appendix B: Recommended roadway/access configuration -- Appendix C: Access control plan (ACP) -- Appendix D: Draft inter-governmental agreement -- Appendix E: Property information -- Appendix F: Average daily traffic (ADT) -- Appendix G: Turning movement counts (TMC) -- Appendix H: Existing level of service (LOS) -- Appendix I: Accident data -- Appendix J: 2035 no-action level of service (LOS) roadway laneage -- Appendix K: Initial public open house materials -- Appendix L: Second public open house materials -- Appendix M: Final Public Open House Materials -- Appendix N: Future level of service with recommended changes to access -- Appendix O: Conceptual design improvements at US 50/Unaweep Avenue and US 50/B 1/2 Road., Cover title., "November 2008."
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater. Appendix B: Recommended Roadway/Access Configuration
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater. Appendix B: Recommended Roadway/Access Configuration
Access control plan -- Appendix A: Existing roadway/access configuration -- Appendix B: Recommended roadway/access configuration -- Appendix C: Access control plan (ACP) -- Appendix D: Draft inter-governmental agreement -- Appendix E: Property information -- Appendix F: Average daily traffic (ADT) -- Appendix G: Turning movement counts (TMC) -- Appendix H: Existing level of service (LOS) -- Appendix I: Accident data -- Appendix J: 2035 no-action level of service (LOS) roadway laneage -- Appendix K: Initial public open house materials -- Appendix L: Second public open house materials -- Appendix M: Final Public Open House Materials -- Appendix N: Future level of service with recommended changes to access -- Appendix O: Conceptual design improvements at US 50/Unaweep Avenue and US 50/B 1/2 Road., Cover title., "November 2008."
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater. Appendix C: Access Control Plan (ACP)
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater. Appendix C: Access Control Plan (ACP)
Access control plan -- Appendix A: Existing roadway/access configuration -- Appendix B: Recommended roadway/access configuration -- Appendix C: Access control plan (ACP) -- Appendix D: Draft inter-governmental agreement -- Appendix E: Property information -- Appendix F: Average daily traffic (ADT) -- Appendix G: Turning movement counts (TMC) -- Appendix H: Existing level of service (LOS) -- Appendix I: Accident data -- Appendix J: 2035 no-action level of service (LOS) roadway laneage -- Appendix K: Initial public open house materials -- Appendix L: Second public open house materials -- Appendix M: Final Public Open House Materials -- Appendix N: Future level of service with recommended changes to access -- Appendix O: Conceptual design improvements at US 50/Unaweep Avenue and US 50/B 1/2 Road., Cover title., "November 2008."
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater. Appendix D: Draft Inter-Governmental Agreement
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater. Appendix D: Draft Inter-Governmental Agreement
Access control plan -- Appendix A: Existing roadway/access configuration -- Appendix B: Recommended roadway/access configuration -- Appendix C: Access control plan (ACP) -- Appendix D: Draft inter-governmental agreement -- Appendix E: Property information -- Appendix F: Average daily traffic (ADT) -- Appendix G: Turning movement counts (TMC) -- Appendix H: Existing level of service (LOS) -- Appendix I: Accident data -- Appendix J: 2035 no-action level of service (LOS) roadway laneage -- Appendix K: Initial public open house materials -- Appendix L: Second public open house materials -- Appendix M: Final Public Open House Materials -- Appendix N: Future level of service with recommended changes to access -- Appendix O: Conceptual design improvements at US 50/Unaweep Avenue and US 50/B 1/2 Road., Cover title., "November 2008."
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater. Appendix E: Property Information
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater. Appendix E: Property Information
Access control plan -- Appendix A: Existing roadway/access configuration -- Appendix B: Recommended roadway/access configuration -- Appendix C: Access control plan (ACP) -- Appendix D: Draft inter-governmental agreement -- Appendix E: Property information -- Appendix F: Average daily traffic (ADT) -- Appendix G: Turning movement counts (TMC) -- Appendix H: Existing level of service (LOS) -- Appendix I: Accident data -- Appendix J: 2035 no-action level of service (LOS) roadway laneage -- Appendix K: Initial public open house materials -- Appendix L: Second public open house materials -- Appendix M: Final Public Open House Materials -- Appendix N: Future level of service with recommended changes to access -- Appendix O: Conceptual design improvements at US 50/Unaweep Avenue and US 50/B 1/2 Road., Cover title., "November 2008."
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater. Appendix F: Average Daily Traffic
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater. Appendix F: Average Daily Traffic
Access control plan -- Appendix A: Existing roadway/access configuration -- Appendix B: Recommended roadway/access configuration -- Appendix C: Access control plan (ACP) -- Appendix D: Draft inter-governmental agreement -- Appendix E: Property information -- Appendix F: Average daily traffic (ADT) -- Appendix G: Turning movement counts (TMC) -- Appendix H: Existing level of service (LOS) -- Appendix I: Accident data -- Appendix J: 2035 no-action level of service (LOS) roadway laneage -- Appendix K: Initial public open house materials -- Appendix L: Second public open house materials -- Appendix M: Final Public Open House Materials -- Appendix N: Future level of service with recommended changes to access -- Appendix O: Conceptual design improvements at US 50/Unaweep Avenue and US 50/B 1/2 Road., Cover title., "November 2008."
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater. Appendix G: Turning Movement Counts (TMC)
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater. Appendix G: Turning Movement Counts (TMC)
Access control plan -- Appendix A: Existing roadway/access configuration -- Appendix B: Recommended roadway/access configuration -- Appendix C: Access control plan (ACP) -- Appendix D: Draft inter-governmental agreement -- Appendix E: Property information -- Appendix F: Average daily traffic (ADT) -- Appendix G: Turning movement counts (TMC) -- Appendix H: Existing level of service (LOS) -- Appendix I: Accident data -- Appendix J: 2035 no-action level of service (LOS) roadway laneage -- Appendix K: Initial public open house materials -- Appendix L: Second public open house materials -- Appendix M: Final Public Open House Materials -- Appendix N: Future level of service with recommended changes to access -- Appendix O: Conceptual design improvements at US 50/Unaweep Avenue and US 50/B 1/2 Road., Cover title., "November 2008."
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater. Appendix H: Existing Level of Service (LOS)
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater. Appendix H: Existing Level of Service (LOS)
Access control plan -- Appendix A: Existing roadway/access configuration -- Appendix B: Recommended roadway/access configuration -- Appendix C: Access control plan (ACP) -- Appendix D: Draft inter-governmental agreement -- Appendix E: Property information -- Appendix F: Average daily traffic (ADT) -- Appendix G: Turning movement counts (TMC) -- Appendix H: Existing level of service (LOS) -- Appendix I: Accident data -- Appendix J: 2035 no-action level of service (LOS) roadway laneage -- Appendix K: Initial public open house materials -- Appendix L: Second public open house materials -- Appendix M: Final Public Open House Materials -- Appendix N: Future level of service with recommended changes to access -- Appendix O: Conceptual design improvements at US 50/Unaweep Avenue and US 50/B 1/2 Road., Cover title., "November 2008."
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater. Appendix I: Accident Data
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater. Appendix I: Accident Data
Access control plan -- Appendix A: Existing roadway/access configuration -- Appendix B: Recommended roadway/access configuration -- Appendix C: Access control plan (ACP) -- Appendix D: Draft inter-governmental agreement -- Appendix E: Property information -- Appendix F: Average daily traffic (ADT) -- Appendix G: Turning movement counts (TMC) -- Appendix H: Existing level of service (LOS) -- Appendix I: Accident data -- Appendix J: 2035 no-action level of service (LOS) roadway laneage -- Appendix K: Initial public open house materials -- Appendix L: Second public open house materials -- Appendix M: Final Public Open House Materials -- Appendix N: Future level of service with recommended changes to access -- Appendix O: Conceptual design improvements at US 50/Unaweep Avenue and US 50/B 1/2 Road., Cover title., "November 2008."
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater. Appendix J: 2035 No-Action Level of Service (LOS) Roadway Laneage
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater. Appendix J: 2035 No-Action Level of Service (LOS) Roadway Laneage
Access control plan -- Appendix A: Existing roadway/access configuration -- Appendix B: Recommended roadway/access configuration -- Appendix C: Access control plan (ACP) -- Appendix D: Draft inter-governmental agreement -- Appendix E: Property information -- Appendix F: Average daily traffic (ADT) -- Appendix G: Turning movement counts (TMC) -- Appendix H: Existing level of service (LOS) -- Appendix I: Accident data -- Appendix J: 2035 no-action level of service (LOS) roadway laneage -- Appendix K: Initial public open house materials -- Appendix L: Second public open house materials -- Appendix M: Final Public Open House Materials -- Appendix N: Future level of service with recommended changes to access -- Appendix O: Conceptual design improvements at US 50/Unaweep Avenue and US 50/B 1/2 Road., Cover title., "November 2008."
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater. Appendix K: Initial Public Open House Materials
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater. Appendix K: Initial Public Open House Materials
Access control plan -- Appendix A: Existing roadway/access configuration -- Appendix B: Recommended roadway/access configuration -- Appendix C: Access control plan (ACP) -- Appendix D: Draft inter-governmental agreement -- Appendix E: Property information -- Appendix F: Average daily traffic (ADT) -- Appendix G: Turning movement counts (TMC) -- Appendix H: Existing level of service (LOS) -- Appendix I: Accident data -- Appendix J: 2035 no-action level of service (LOS) roadway laneage -- Appendix K: Initial public open house materials -- Appendix L: Second public open house materials -- Appendix M: Final Public Open House Materials -- Appendix N: Future level of service with recommended changes to access -- Appendix O: Conceptual design improvements at US 50/Unaweep Avenue and US 50/B 1/2 Road., Cover title., "November 2008."
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater. Appendix L: Second Public Open House Materials
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater. Appendix L: Second Public Open House Materials
Access control plan -- Appendix A: Existing roadway/access configuration -- Appendix B: Recommended roadway/access configuration -- Appendix C: Access control plan (ACP) -- Appendix D: Draft inter-governmental agreement -- Appendix E: Property information -- Appendix F: Average daily traffic (ADT) -- Appendix G: Turning movement counts (TMC) -- Appendix H: Existing level of service (LOS) -- Appendix I: Accident data -- Appendix J: 2035 no-action level of service (LOS) roadway laneage -- Appendix K: Initial public open house materials -- Appendix L: Second public open house materials -- Appendix M: Final Public Open House Materials -- Appendix N: Future level of service with recommended changes to access -- Appendix O: Conceptual design improvements at US 50/Unaweep Avenue and US 50/B 1/2 Road., Cover title., "November 2008."
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater. Appendix M: Final Public Open House Materials
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater. Appendix M: Final Public Open House Materials
Access control plan -- Appendix A: Existing roadway/access configuration -- Appendix B: Recommended roadway/access configuration -- Appendix C: Access control plan (ACP) -- Appendix D: Draft inter-governmental agreement -- Appendix E: Property information -- Appendix F: Average daily traffic (ADT) -- Appendix G: Turning movement counts (TMC) -- Appendix H: Existing level of service (LOS) -- Appendix I: Accident data -- Appendix J: 2035 no-action level of service (LOS) roadway laneage -- Appendix K: Initial public open house materials -- Appendix L: Second public open house materials -- Appendix M: Final Public Open House Materials -- Appendix N: Future level of service with recommended changes to access -- Appendix O: Conceptual design improvements at US 50/Unaweep Avenue and US 50/B 1/2 Road., Cover title., "November 2008."
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater. Appendix N: Future Level of Service with Recommended Changes to Access
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater. Appendix N: Future Level of Service with Recommended Changes to Access
Access control plan -- Appendix A: Existing roadway/access configuration -- Appendix B: Recommended roadway/access configuration -- Appendix C: Access control plan (ACP) -- Appendix D: Draft inter-governmental agreement -- Appendix E: Property information -- Appendix F: Average daily traffic (ADT) -- Appendix G: Turning movement counts (TMC) -- Appendix H: Existing level of service (LOS) -- Appendix I: Accident data -- Appendix J: 2035 no-action level of service (LOS) roadway laneage -- Appendix K: Initial public open house materials -- Appendix L: Second public open house materials -- Appendix M: Final Public Open House Materials -- Appendix N: Future level of service with recommended changes to access -- Appendix O: Conceptual design improvements at US 50/Unaweep Avenue and US 50/B 1/2 Road., Cover title., "November 2008."
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater. Appendix O: Conceptual Design Improvements at US 50/Unaweep Avenue and US 50/B 1/2 Road
Final United States Highway 50 access control plan, west of Grand Mesa Avenue to State Highway 141A in Whitewater. Appendix O: Conceptual Design Improvements at US 50/Unaweep Avenue and US 50/B 1/2 Road
Access control plan -- Appendix A: Existing roadway/access configuration -- Appendix B: Recommended roadway/access configuration -- Appendix C: Access control plan (ACP) -- Appendix D: Draft inter-governmental agreement -- Appendix E: Property information -- Appendix F: Average daily traffic (ADT) -- Appendix G: Turning movement counts (TMC) -- Appendix H: Existing level of service (LOS) -- Appendix I: Accident data -- Appendix J: 2035 no-action level of service (LOS) roadway laneage -- Appendix K: Initial public open house materials -- Appendix L: Second public open house materials -- Appendix M: Final Public Open House Materials -- Appendix N: Future level of service with recommended changes to access -- Appendix O: Conceptual design improvements at US 50/Unaweep Avenue and US 50/B 1/2 Road., Cover title., "November 2008."

Pages