Jump to navigation
TRA Colorado Department of Transportation
Pages

- Opportunities for sustainable TMA funding

- Optimization of concrete pavement mix design in Colorado

- Optimization of stabilization of highway embankment slopes using driven piles, phase I

- Optimum use of CDOT French and Hamburg data (French and Hamburg tests)

- PCCP texturing methods

- Peak discharge, flood frequency, and peak stage of floods on Big Cottonwood Creek at U.S. Highway 50 near Coaldale, Colorado, and Fountain Creek below U.S. Highway 24 in Colorado Springs, Colorado, 2016

- Peak to Peak Scenic and Historic Byway, north central Colorado visual intrusion reduction plan

- Pedestrian safety: kindergarten through 3rd grade

- Pedestrian signals

- Performance evaluation of various HMA rehabilitation strategies

- Performance evaluation of various corrosion protection systems of bridges in Colorado

- Performance of Colorado's first rubblization project on I 76 near Sterling

- Performance of a GRS-IBS bridge abutment : Colorado case study

- Performance of chip seals using local and minimally processed low traffic volume roadways

- Performance of geosynthetic-reinforced walls supporting the Founders/Meadows Bridge and approaching roadway structures Report 1, Design, materials, construction, instrumentation and preliminary results

- Performance of geosynthetic-reinforced walls supporting the Founders/Meadows Bridge and approaching roadway structures Report 2: Assessment of the performance and design of the front GRS walls and recommendations for future GRS abutments

- Performance of thin bonded epoxy overlays on asphalt and concrete bridge deck surfaces

- Permeability research with the ROMUS air permeameter

- Pilot escort and oversize restriction map

- Plan de transporte estatal 2035
Pages