CWR Colorado Water Resources and Power Development Authority

Cache la Poudre basin study extension : prepared for Colorado Water Resources & Power Development
Cache la Poudre basin study extension : prepared for Colorado Water Resources & Power Development
project sponsor, Northern Colorado Water Conservancy District ; study participants, EBASCO Environmental [and others]., Volumes 1 and 2 final report -- volume 3, Executive summary., "December 1990.", Online version lacks the three volumes of appendices., Includes bibliographical references., Print version record.
Cache la Poudre basin water and hydropower resources management study : final report
Cache la Poudre basin water and hydropower resources management study : final report
Colorado Water Resources & Power Development Authority ; prepared by Harza Engineering Company and consultants Leonard Rice Consulting Water Engineers [and others]., "January 1987.", Includes bibliographic references., Print version record.
Cache la Poudre basin water and hydropower resources management study. Summary report
Cache la Poudre basin water and hydropower resources management study. Summary report
Colorado Water Resources & Power Development Authority ; prepared by Harza Engineering Company ; and consultants: Leonard Rice Consulting Water Engineers [and three others]., "January 1987.", Description based on print version.
Cultural resource investigations in stage one areas of the basin study extension, Cache La Poudre hydroelectric project, Larimer County, Colorado
Cultural resource investigations in stage one areas of the basin study extension, Cache La Poudre hydroelectric project, Larimer County, Colorado
Cultural resource inventories on Federal lands are required specifically under the National Historic Preservation Act (NHPA) of 1966 (as amended; PL 96-515, 1980). Cultural resource inventories were conducted for the Cache la Poudre Hydroelectric Project basin extension study in eastern Larimer County, Colorado. Twenty-nine sites were recorded. Of this number, 10 are prehistoric and 20 are historic. Prehistoric sites consist of open camps and lithic scatters with and without hearths and stone circles, and rock shelters with deeply stratified deposits. They span the Paleo-Indian through Late Prehistoric stages. Historic sites include homesteads, miscellaneous structures and structural remnants, bridges, canals, a mine, and a recently abandoned water filtration facility. They date from the late 19th to late 20th century. Eighteen isolated finds were also recorded, of which eight are prehistoric and 10 are historic., by Marcus P. Grant, Christian J. Zier, Robert G. Rosenberg ; prepared for Envirosphere Company and Colorado Water Resources and Power Development Authority ; by Centennial Archaeology, Inc., "February 1988.", Bibliography: pages 240-252., Online resource; title from PDF cover (viewed February 2018)
Final report Clear Creek project. Phase I, Step 2, Feasibility study
Final report Clear Creek project. Phase I, Step 2, Feasibility study
prepared by Tudor Engineering Company in association with Cheryl Signs Engineering [and 3 others]., Vol. 1. Final report -- v. 2. Summary report., "June 1989.", "Prepared for: Colorado Water Resources and Power Development Authority.", Includes bibliography., Print version record.
Final report Clear Creek project. Phase I. Feasibility study
Final report Clear Creek project. Phase I. Feasibility study
prepared by Tudor Engineering Company in association with Cheryl Signs Engineering, Woodward-Clyde Consultants, Western Environmental Analysts, Inc., "November 1987.", Includes bibliography., Print version record.
Final report, Cherry Creek water resources project. Phase I, Feasibility study : final report
Final report, Cherry Creek water resources project. Phase I, Feasibility study : final report
prepared for the Colorado Water Resources & Power Development Authority ; [by] Morrison-Knudsen Engineers, Inc., Cover title., "December 1987.", Includes bibliographical references., Print version record.
Final report, Joint-use Reservoir and Green Mountain exchange projects
Final report, Joint-use Reservoir and Green Mountain exchange projects
prepared for Colorado Water Resources and Power Development Authority ; prepared by Boyle Engineering Corporation., "April 1987.", Includes bibliography., Print version record.
Joint-use Reservoir and Green Mountain exchange projects, summary report, preliminary hydrologic analysis
Joint-use Reservoir and Green Mountain exchange projects, summary report, preliminary hydrologic analysis
prepared for Colorado Water Resources and Power Development Authority ; [prepared by] Boyle Engineering Corporation., "August 1986.", Online resource; title from PDF title page (viewed February 2018)
Lemon Dam project feasibility report
Lemon Dam project feasibility report
[prepared] for Colorado Water Resources and Power Development Authority and Florida Water Conservancy District by Harris Water Engineering., Vol. 1. Main report -- v. 2. Appendixes., Print version record.
San Luis Valley confined aquifer study. Phase I. Interim task 5 report : deep well testing and field investigations
San Luis Valley confined aquifer study. Phase I. Interim task 5 report : deep well testing and field investigations
prepared for Colorado Water Resources and Power Development Authority ; by HRS Water Consultants, Inc., "June, 1987.", Includes bibliographical references., Description based on print version.
St. Vrain basin reconnaissance study
St. Vrain basin reconnaissance study
"February, 1986.", Includes bibliographical references., Mode of access: World Wide Web.
Summary report, Clear Creek project. Phase I, Feasibility study : summary report
Summary report, Clear Creek project. Phase I, Feasibility study : summary report
prepared for: Colorado Water Resources & Power Development Authority ; prepared by Tudor Engineering Company, in association with Cheryl Signs Engineering, Woodward-Clyde Consultants, Western Environmental Analysts, Inc., "November 1987.", Print version record.
Summary report, Joint-use Reservoir and Green Mountain exchange projects
Summary report, Joint-use Reservoir and Green Mountain exchange projects
prepared for Colorado Water Resources and Power Development Authority ; prepared by Boyle Engineering Corporation., "April 1987.", Print version record.
Upper Gunnison-Uncompahgre Basin : phase I feasibility study : submitted to Colorado Water Resources and Power Development Authority
Upper Gunnison-Uncompahgre Basin : phase I feasibility study : submitted to Colorado Water Resources and Power Development Authority
prepared by HDR Engineering, Inc. in association with WBLA, Inc. [and others]., v. 1. Final report -- v. 2. Final report appendices -- [v. 3] Summary report., "May 1989"--Cover., Includes bibliographical references., Print version record.
Wildlife resource studies for Cache la Poudre Basin study extension
Wildlife resource studies for Cache la Poudre Basin study extension
The wildlife resource studies focused on determining effects of the proposed project on game and non-game terrestrial resources and the vegetative and topographic features which comprise their habitat. The objectives of the study were to: (1) characterize wildlife use of the existing environment; (2) assess the potential effects of the proposed project on wildlife; (3) identify possible mitigation measures; and (4) prepare a preliminary estimate of the costs required to mitigate potential impacts., prepared for Colorado Water Resource and Power Development Authority, by Envirosphere Company., "October 1988.", Includes bibliographic references pages 6-119 to 6-127., Online resource; title from PDF cover (viewed January 2018)